A new exterior paint job and updated fencing made this learning center a stand out in the community.
Read MoreThis was a tenant improvement to an existing 5,912 square foot suite for a new optometry office. Work included implementing new mechanical, plumbing, and electrical due to the complete renovation of the space.
Read MoreThis tenant improvement expanded the existing convenience store into the adjacent casino space and included construction of a new cooler/freezer as part of the interior remodel. The Lepori team had to keep the existing store and sandwich shop operational while working around the customers in order to update all interior finishes, install additional cabinetry and provide the additional market space needed at this busy location.
Read MoreThe Lepori team constructed a new 4,087sf convenience store on a five-acre site which included passenger vehicle fuel dispensers, diesel truck fuel dispensers and above-grade fuel storage tanks.
Read MoreThis project involved relocating the existing Sportsbook and creating a new Bingo space. The installation of a storefront system to close off the area for certain days of the week. New flooring, casework, and electrical created a welcoming space for new and seasonal players alike.
Read MoreThe Lepori team did the construction of an 1,875 sf office/residence building and seven storage buildings of various sizes amounting to roughly 107,00 sf. On the same site the Lepori team constructed a 4,995 sf car wash building with a equipment room, two drive thru automatic wash bays and five self wash bays.
Read MoreThe Lepori team constructed a new 13,263 square foot shell building and associated site improvements located in the Damonte Ranch Town Center. The shell was built from the ground up In between the existing Office Depot and Safeway.
Read MoreThe Lepori team demoed the existing building and fuel canopies to make way for a brand new convenience store including new fuel canopies, a new fuel system, below-grade storage tanks, and utility provisions for a future retail pad located on the same parcel. To keep everything consistent our client wanted this location to resemble the remodel that was done in Carson City.
Read MoreThe Lepori team gave this convenience store a face life that is consistent with the remodels the team has done for Golden Gate Petroleum. This store is part of a multi business building; our team carefully constructioned around the other business’s to ensure client comfort and accessibility.
Read MoreWorking in a fully occupied four-story medical building, the Lepori team installed new finishes in the common area lobbies, corridors and restrooms of each floor working off-hours and weekends as needed to ensure work did not impact tenants. Tasks consisted of full flooring replacement, upgrades to all lighting fixtures, replacement of acoustical ceiling tiles, painting and installation of new wall covering to existing elevator walls. The main stairway corridor was also stripped to the existing concrete and steel structure where the concrete was then stained, and the metal components painted.
Read MoreThe Lepori team designed and constructed improvements needed to bring the ‘60s era building up to code and structural integrity. Key challenges included making it ADA compliant, installing racking for the center’s lumber and tenant improvements to a showroom and door shop.
Read MoreThis is a historical building that Frank Lepori purchased after it was extremely damaged from a fire. It was relocated to Sparks and renovated into office space while maintaining the integrity of the original architecture.
Read MoreThis 8,054 sq ft, two-story office underway replaces their previous facility that was demolished after employees were located in temporary trailers. The new office features cabinetry from the Lepori Cabinet Shop.
Read MoreThe 3,312 sq ft design features locking chambers between products and public exits similar to the protocols used in bank design. Beautifully crafted cabinets that sit behind the sales counters have full roll-up locking doors, eliminating the need to lock up product nightly in a safe. Millwork and finishes carry through the Truckee River design theme.
Read MoreOn an 18-week schedule, the Lepori Design-Build team did an extreme makeover of an industrial building at 1301 Financial Way in Fernley to create a Silver State dispensary. We stripped an aging metal warehouse building to its 6,000 sq ft frame and re-skinned it.
Read MoreUsing design-build delivery, the Lepori team is delivering another 20,000 sq ft of cultivation facilities. We demolished existing walls, stairs, and restrooms to create a main floor with 10 flowering rooms and facilities for packing, tissue culture, humidors, and vegetative labs. An upper floor includes additional support facilities.
Read MoreThe Lepori team transformed a dilapidated, condemned warehouse into offices, warehouse, millwork manufacturing, storage and parking to meet the growing needs of our company so we could better serve our clients.
Franny Lepori was able to collaborate with her design-build team to harness the systems that would improve the comfort and care of her horses.
Read MoreThe Lepori team delivered a 3,000 sq ft garage with office and a 660 sq ft workroom and storage building with an attached 320 sq ft glass and CMU block greenhouse.
Read MoreThe Lepori design-build team delivered a 50,000 sq ft building and developed a 10-acre site to create a distribution hub for Truckee Tahoe Lumber. The new facility is on USA Parkway in McCarran and has an office, rail spur, open storage, and a secured perimeter.
Read More